Picture taken on June 11, 2014, near the village of Sajkas, 80 kilometres north of the Serbian capital Belgrade, shows the site where Serbia started the construction in Novemeber 2013 of their section of Russia’s South Stream pipeline. Serbian Prime Minister Aleksandar Vucic said on June 9, 2014 that construction of his country’s stretch of Russia’s South Stream gas pipeline was continuing, disputing a report it had followed Bulgaria in halting work. Gazprom signed a deal with Serbia in October 2012 to construct the 421-kilometre (261-mile) long stretch of the pipeline, worth some 1.9 billion euros ($2.57 billion). AFP PHOTO / ANDREJ ISAKOVIC

Вашият коментар

Попълнете полетата по-долу или кликнете върху икона, за да влезете:

WordPress.com лого

В момента коментирате, използвайки вашия профил WordPress.com. Излизане /  Промяна )

Google photo

В момента коментирате, използвайки вашия профил Google. Излизане /  Промяна )

Twitter picture

В момента коментирате, използвайки вашия профил Twitter. Излизане /  Промяна )

Facebook photo

В момента коментирате, използвайки вашия профил Facebook. Излизане /  Промяна )

Connecting to %s